meta data for this page
- en
This is an old revision of the document!
To Do
General
at PTB
[✓ ssauer, 2016-12-20] transport the mirrors and other stuff to PTB
[✓ ssauer, 2016-10-06] test the mounting, find the right srews and change the hole for the countersunk screw
[✓ ssauer, 2016-10-06] talk with the workshop and Sebastian for srews with wents
[✓ ssauer, 2016-12-20] talk with the workshop and Sebastian for eccentric spacers
[✓ ssauer, 2016-12-20] talk with the workshop and Sebastian for holes in the baseplate (= Drill holes in cavity breadboard)
[✓ ssauer, 2017-01-19] clean vacuum chamber with washing-up liquid and aceton
[✓ ssauer, 2016-10-25] leak test vacuum chamber (Importaant the weld seam )
[✓ ssauer, 2016-10-25] Test the M6 holes from vacuumchamber if all threads are deep enough
at IQ
assembling insitu optical contacing setup
design mask for optical contacting
Simulations for mode matching
[✓ ssauer, 2016-10-25] Order and design breadboard (2x)
[✓ ssauer, 2016-12-20] Order and design eccentrical spacer (1mm from centre)