meta data for this page
  •  
Translations of this page:
  • en

19.10.2016

  • I cleaned the vacuum chamber

  • I tested the all M6 holes from the vacuumchamber --> all threads are deep enough!

  • 2x M4-breadboards (incouple and outcouple) and there spacers are done!
  • I assembled the mounting with vitonballs and zerodur rods. --> We need two vitonballs of each metal sheet side. Otherwise the mounting is to wobbly! --> 8x new sinkings for the vitonballs! If you fixed the mounting screws: tighten them crosswise!

  • Leaktest --> positiv :-/ --> New weld!

ToDo in Hannover

  • Design and order new spacer instead ofeccentrical spacer (1mm from centre)
  • 8x sinkings for the vitonballs
  • 3x 1cm sinking grooves for the glasballs (1mm less then the theory). Use 90° milling head! Front: 2x vertical to the zerodur rods, Back: 1x parallel to the zerodur rods! Distance between the middle of the two mountings 28cm.

ToDo in PTB

  • Sebastian took the vacuum chamber to the workshop for a new weld!