Checklist after power failure
Check both IGP Controller for the resonators R1 + R2
- Current should be below 2 mA (both should show “HV ON” (green LED on)
- Check both USV for IGP´S
Turn on the computers
Check Meerstetter TEC for R1 + R2 + ECDL
- Green LED on?
- Check in the software TEC Service v2.70 - R1, TEC Service v2.70 - R2 and TEC Service v2.70 - ECDL Baseplate on the ResLab-PC:
- How is the behavior of the temperature?
- Check both USV for TEC´s
Check the air conditioner for the entire room
- Is the air-conditioning system switched on?
- Is the V-belt (=Keilriemen) broken?
- What is the temperature of the draft (=Zugluft)? → should be >20 °C
- Check the electric fuse (=Sicherung) on the third floor
Check the H-Maser
- All LED are green?
- Check in the Software VCH on the ResLabMobil:
- All values except for D2h must be green!
Check the 914nm-laser
- Light is on? Powermodule is on?
- TA stabilization is ok?
- Laserdiode is on?
- How much power is in front of the resonator? → should be 70-100 µW
- What wavelength does the Wavemeter display?
Check the 10 MHz reference and set all frequencies in the lab
- GPS-Receiver is working?
- LED flashes orange/yellow?
- If not Turn on the PWR switch until LED flashes
- Start the software Net View and connect the receiver (COM Port2)
- Rb-clock is working?
- Check the LED´s:
- Power-LED and Locked-LED have to be green
- 1 pps sync-LED has to be green
- 1 pps input-LED has to flash
- Check the 10 MHz-frequency output with an spectrum analyzer, if there is 10 MHz.
- Check the 10 MHz distributor synthesizer
- Ext refernce 10 MHz direct is working?
- Set correct values
- Check all other synthesizer
- Ext refernce 10 MHz direct is working?
- Set correct values
Check frequency comb
- Laser and amplifier are on?
- Check LED´s
- Do the software fiber laser and fiber comb control work?
- Can you speak with the comb?
Check the counter
- Does the software FXQE80 work?
- If not: Turn off and on the counter (cold-device plug disconnect and connect)
Check the fiber Link to PTB
- Turn everthing on, like ther spectrum analysizer
- Restart the PC in the Atom Lab
- Call them!
If the temperature is normal again, then…
- Stabilize the laser of R1
- Turn on the Laserdiode
- Turn on the TA
- Couple the light into the TA
- Turn on the TA stabilization
- Lock R1
- Stablize the frequency comb
- Lock Ceo
- Lock Rep
- Measure the frequencies with the counter:
- 914nm
- frep
- 10 MHz
- virtuel beat