meta data for this page
Translations of this page:
  • en

Jour Fixe

WFP, PG, SS, NJ, kHz

General

  • Pia wants to do her B.Sc at Mg Atomslab (January).
    • Meeting with her Wednesday 14-15h

Atomslab

  • Replaced L4
  • T-MOT and DT working with replaced L4 now
    • Frequency instabilities of the previous L4 now solved
  • Investigate the power instability of L2/AOM this week
  • Also continue with Nishads measurements for his thesis
  • Quench system
    • Fiber coupling efficiency is bad right now → To be adjusted (10mW → 100 µW)
  • Magic System
    • Changed lense to SHG coupling → 1.5 W
    • Infront of fiber: 1.1-1.2 W
      • Seems to be limited by stimulated brillouin scattering at ~ 1W. Fiber output limited to around 650 mW
  • Money discussion with Ernst today - What to buy?
    • Replacement of L2 system?
      • Toptica?
      • Stefan Hannig SHG?

ResLab

  • Comb kept on locked over whole week
  • PCF coupling missing yet