meta data for this page
Translations of this page:
  • en

Jour Fixe

SS, WFP, PG

Atomslab

  • AC was fixed by the 4440 guys → filter has to be changed once a year

Quench

  • The alignment of the fiber from the laser further dropped to 570 mW out of 1400 mW.
  • Alignment of AOM in progress

PTB/Meta-mirror

  • Reflectivity of Meta-mirror was measured to be 99.8x% via Ring-Down
  • Measurement of transmission is planned (preperation in progress)
  • (time-consuming) Tender-process for Wavemeter