meta data for this page
  •  
Translations of this page:
  • en

Jour Fixe

Present: NJ, WF, SS, DF, KHZ, PG

Maser: A. Bauch will take care on that S. Sauer:

  • PCF is ordered: will arrive this week
  • OXCO behaviour check after switching off and on again, and backup with upc
  • gps receiver on/off behaviour checked

Atom Lab:

  • Laser 2 TA changed, translation stage for the cylindrical lens implemented
  • 50% through fiber due to new Diodes with a more elongated beam shape, since than problems with fiber coupling
  • new pc for Xabbu3, money will come from vlbai
  • no Notstrom available, is supplied by batteries

Quench laser:

  • got rid of frequency jumps with new TA
  • Intensity fluctuations removed by aligning the polarization to the fiber
  • Beam height aligned
  • Waldemar calculated scattering rate to 1k at 20mW and 350um.

2nd Atom lab: part will go to QG, Saturation spectroscopy to Main lab, discussion an Wednesday with Ernst on that

Next meeting: 6.01.