Checklist after power failure

If you know a power failure will come, than turn off everthing (without Meerstetter, IGP´s and H-Maser)! And organise a lot of USV´s

Check both IGP Controller for the resonators R1 + R2

Turn on the computers

Check Meerstetter TEC for R1 + R2 + ECDL

Check the air conditioner for the entire room

Check the H-Maser

Check the 914nm-laser

Check the 10 MHz reference and set all frequencies in the lab

Check frequency comb

Check the counter

Check the fiber Link to PTB

If the temperature is normal again, then…

  1. Stabilize the laser of R1
    1. Turn on the Laserdiode
    2. Turn on the TA
    3. Couple the light into the TA
    4. Turn on the TA stabilization
    5. Lock R1
  2. Stablize the frequency comb
    1. Lock Ceo
    2. Lock Rep
  3. Measure the frequencies with the counter:
    1. 914nm
    2. frep
    3. 10 MHz
    4. virtuel beat