Jour Fixe
Members in attendance: NJ, SS, kHz
Atom Lab:
Problems with lock of transfer cavity to the clock laser. Could be an issue of the modulation to the laser. This needs to be checked.
Resonator Lab:
Efficiency of waveguide SHG at 780 nm (1.5 mW out of 20 mW input power).
New PC has been setup and is running. Next step is to transfer data from old PC to new one.
Next meeting: 24.02.2020