Members in attendance: NJ, SS, kHz, DF, WFP, PG
Atom Lab:
Triplet lasers are turned on and readjusted. Still some problems with laser 4 frequency alignment.
Ti:Sa readjusted with the cavity mirrors, and maximum power achieved 1.17 W after isolator. Working right now on adjusting to the SHG.
Quench Laser:
Resonator Lab:
Everything has been ordered for the new lab PC.
Also ordered the stuff from Thorlabs to align the PCF (translation stages and such).
We received a software from K+K which can allow for getting alerts if the counter frequencies deviate from their setpoint by a certain margin.
For the metamirror project, found modes in the setup with the reference mirrors for first time. What helped was switching to a new laser which allowed software scanning of its piezo.
The counters allow for
LAN connectivity which could make it possible to run different measurements from different computers. But unfortunately devices cannot be aloowed directly on institute network. Therefore a “magnesium lab network” can be setup which would allow magnesium computers to access the counters via a raspberry pi in between. Possible HiWi job, but not extremely urgent.
Next meeting: 03.02.2020