====== 05.10.2016 ====== * Vacuum chamber was cleaned with dishwashing detergent * Discussion about the breadboard (M3 screw size, small passage for the light, aluminium) and spacer (3cm, plastic) for incouple and outcouple light from the cavity * Mounting (holes for countersunk head screws) was repaired * Countersunk head screws installed in mounting. Probably, screws made of V2A steel: {{:groups:mg:project_ptb-cavity:labbook:2016-10:img_1574.jpg?300|}} **ToDo in Hannover:** * Order and design breadboard (2x) * Order and design eccentrical spacer (1mm from centre) **Next time at PTB:** * Clean the vacuum chamber with acetone * Drill holes in cavity breadboard * Test the M6 holes from vacuumchamber if all threads are deep enough.