====== Jour Fixe ====== SS, WFP, PG ====== Atomslab ====== * AC was fixed by the 4440 guys -> filter has to be changed once a year ====== Quench ====== * The alignment of the fiber from the laser further dropped to 570 mW out of 1400 mW. * Alignment of AOM in progress ====== PTB/Meta-mirror ====== * Reflectivity of Meta-mirror was measured to be 99.8x% via Ring-Down * Measurement of transmission is planned (preperation in progress) * (time-consuming) Tender-process for Wavemeter