==== Jour Fixe ==== Members in attendance: NJ, SS, DF, WFP, PG, FW Atom Lab: * Windows installation and Labview installation done on all PCs. Also the Xabbu4 PC is more or less fully ready. * Higher order lattice AC Stark shifts are too large at high intensities to go on with in-situ AC Stark shift measurements. NJ will write to Ernst to postpone the frequency measurement. * For the new triplet laser test-station: * FW is working on temperature controller based on HTC 3000 * Still waiting for PCBs of laser driver (new version 2.4) * Quench Laser: * Went back to old KMK laser diode from ThorLabs laser driver * With a bad lock to cavity, 50 mW blue out of 350 mW IR (Still IR present with blue light????) * Error signal from lockin amplifier looks bad, the DC input is dominating the output Resonator Lab: * Some problems with windows installation in reslab due to lack of a proper protocol. After all software installations, SS will try to implement the repaired frequency comb and see if all works OK. * Waiting for some hardware from Menlo to enable in coupling of light to new PCF * New clock laser fiber between labs * Some problems with the amplitude fluctuations in error signal of fiber stabilization. Either some electronic issue or polarization fluctuations. It is still lockable though. Next meeting: 20.01.2020