groups:mg:todo [2018/10/22 10:51] – ToDo unchecked: Neue shutter (nicht SUNEX) kaufen. Z.b. diese hier? (http://www.eopc.com/sh35.html). Benötigen aber neuen Shutter-Treiber. njhagroups:mg:todo [2020/02/07 10:05] (current) – ToDo checked: Replace current-stabilization with the PCB of VLBAI/Christian Meiners + fully characterize this. Use ultra-stable vishay resistor (4-wire not 2-wire) in the PCB fiene
Line 10: Line 10:
   * <todo #njha:2017-12-18> Replacing the laser diodes in Laser 1 and 4. (End of November) [W,N]   * <todo #njha:2017-12-18> Replacing the laser diodes in Laser 1 and 4. (End of November) [W,N]
  - Aligning everything afterwards and getting a working T-MOT</todo>  - Aligning everything afterwards and getting a working T-MOT</todo>
-  * <todo> Setup of breadboard and the absorption imaging. (End of December) [W,N]</todo>+  * <todo #wfriesen:2018-10-23> Setup of breadboard and the absorption imaging. (End of December) [W,N]</todo>
   * <todo #wfriesen:2017-11-06> Checking all the options for all the optics with higher TiSa power. (End of October) [N]</todo>   * <todo #wfriesen:2017-11-06> Checking all the options for all the optics with higher TiSa power. (End of October) [N]</todo>
   * <todo> Mass spectrometry of old viewport windows (End of November) [N]</todo>   * <todo> Mass spectrometry of old viewport windows (End of November) [N]</todo>
   * <todo #njha:2017-11-01> Ordering dipole laser. (Mid November) [N]</todo>   * <todo #njha:2017-11-01> Ordering dipole laser. (Mid November) [N]</todo>
   * <todo #njha:2017-12-18> New triplet laser diodes (End of October) [N]</todo>   * <todo #njha:2017-12-18> New triplet laser diodes (End of October) [N]</todo>
-  * <todo> Viewport UV treatment/test setup. (End of October) [N]</todo>+  * <todo #wfriesen:2018-10-23> Viewport UV treatment/test setup. (End of October) [N]</todo>
   * <todo #wfriesen:2018-10-22> Update all the mounts and holder stuff in the lab. (End of October) [N,W]</todo>   * <todo #wfriesen:2018-10-22> Update all the mounts and holder stuff in the lab. (End of October) [N,W]</todo>
   * <todo> Change rotary pump oil. (End of November) [N,W]</todo>   * <todo> Change rotary pump oil. (End of November) [N,W]</todo>
Line 51: Line 51:
 ==== Homg. B-Field ==== ==== Homg. B-Field ====
   * <todo> Repair the interlock for the homogeneous field current </todo>   * <todo> Repair the interlock for the homogeneous field current </todo>
-  * <todo>Replace current-stabilization with the PCB of VLBAI/Christian Meiners + fully characterize this. Use ultra-stable vishay resistor (4-wire not 2-wire) in the PCB</todo>+  * <todo #fiene:2020-02-07>Replace current-stabilization with the PCB of VLBAI/Christian Meiners + fully characterize this. Use ultra-stable vishay resistor (4-wire not 2-wire) in the PCB</todo>
   * <todo>New coils?</todo>   * <todo>New coils?</todo>