meta data for this page
  •  

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
groups:mg:project_ptb-cavity:todo [2017/05/10 13:53] ssauergroups:mg:project_ptb-cavity:todo [2018/06/12 07:42] (current) ssauer
Line 5: Line 5:
  
 __**at PTB**__ __**at PTB**__
 +
 +<todo #ssauer:2017-10-27> Peltiers testen </todo>\\
 +<todo> Magnet vom Vakuumsensor nutzen? </todo>\\
 +<todo> Bevor der Laser nach Hannover kommt, müssen alle Q-DDS und DDS so umgebaut werden, dass die Referenz 10MHz sind anstatt 100MHz </todo>\\
  
  
Line 10: Line 14:
 __**at IQ**__ __**at IQ**__
  
-<todo> assembling insitu optical contacing setup </todo>\\ 
-<todo> design mask for optical contacting </todo>\\ 
-<todo> Simulations for mode matching </todo>\\