groups:mg:project_ptb-cavity:todo [2016/12/20 14:12] – ToDo checked: Order and design eccentrical spacer (1mm from centre) ssauergroups:mg:project_ptb-cavity:todo [2018/06/12 07:42] (current) ssauer
Line 6: Line 6:
 __**at PTB**__ __**at PTB**__
  
-<todo #ssauer:2016-12-20> transport the mirrors and other stuff to PTB </todo>\\ +<todo #ssauer:2017-10-27Peltiers testen </todo>\\ 
-<todo #ssauer:2016-10-06test the mounting, find the right srews and change the hole for the countersunk screw </todo>\\ +<todo> Magnet vom Vakuumsensor nutzen? </todo>\\ 
-<todo #ssauer:2016-10-06talk with the workshop and Sebastian for srews with wents </todo>\\ +<todo> Bevor der Laser nach Hannover kommt, müssen alle Q-DDS und DDS so umgebaut werden, dass die Referenz 10MHz sind anstatt 100MHz </todo>\\ 
-<todo #ssauer:2016-12-20talk with the workshop and Sebastian for eccentric spacers </todo>\\ + 
-<todo #ssauer:2016-12-20> talk with the workshop and Sebastian for holes in the baseplate (= Drill holes in cavity breadboard) </todo>\\ +
-<todo> clean vacuum chamber with washing-up liquid and aceton </todo>\\ +
-<todo #ssauer:2016-10-25> leak test vacuum chamber (Importaant the weld seam )</todo>\\ +
-<todo #ssauer:2016-10-25> Test the M6 holes from vacuumchamber if all threads are deep enough </todo>\\+
  
 __**at IQ**__ __**at IQ**__
  
-<todo> assembling insitu optical contacing setup </todo>\\ +
-<todo> design mask for optical contacting </todo>\\ +
-<todo> Simulations for mode matching </todo>\\ +
-<todo #ssauer:2016-10-25> Order and design breadboard (2x) </todo>\\ +
-<todo #ssauer:2016-12-20> Order and design eccentrical spacer (1mm from centre) </todo>\\+